R&ER - October 30, 2009
30th October 2009

Dressing up Muncaster Mill for Halloween!

<-- Index | Showing 1-10 of 10 pictures | Index -->
Lady Wakefield arrives in Platform 2 at Ravenglass with one of the all-saloon load 6 Ghost Train sets for decoration.
Lady Wakefield arrives in Platform 2 at Ravenglass with one of the all-saloon load 6 Ghost Train sets for decoration.
2009-10-30 09:45:43
Lady Wakefield outside the carriage shed.
Lady Wakefield outside the carriage shed.
2009-10-30 10:46:06
River Mite simmers quietly to herself in the loco shed at Ravenglass.
River Mite simmers quietly to herself in the loco shed at Ravenglass.
2009-10-30 12:50:52
River Mite charges through Muncaster Mill, light engine on a test run to Dalegarth.
River Mite charges through Muncaster Mill, light engine on a test run to Dalegarth.
2009-10-30 13:41:57
River Mite, returning to Ravenglass light engine.
River Mite, returning to Ravenglass light engine.
2009-10-30 15:19:05
Douglas Ferreira on the 1520 from Ravenglass slows to pick up passengers at Muncaster Mill.
Douglas Ferreira on the 1520 from Ravenglass slows to pick up passengers at Muncaster Mill.
2009-10-30 16:30:55
River Esk brakes for the Muncaster Mill stop so that we can get on the train.
River Esk brakes for the Muncaster Mill stop so that we can get on the train.
2009-10-30 17:18:36
River Mite at the head of the 1730 Ghost Train special.
River Mite at the head of the 1730 Ghost Train special.
2009-10-30 17:27:37
Douglas Ferreira brings the final service train of the day into Ravenglass.
Douglas Ferreira brings the final service train of the day into Ravenglass.
2009-10-30 17:51:05
Driver Ian Birch makes the final checks on the battery of River Mite, which provides power for the headlight during night running.
Driver Ian Birch makes the final checks on the battery of River Mite, which provides power for the headlight during night running.
2009-10-30 17:56:33